RATE FOR RAIN WATER HARVESTING
| SL.NO. |
|
|
|
| 1.
2. 3. a. b. 4. 5.
6.
7.
a. b. c.
|
Percolation
pit alone
Percolation pit with 250 mm dia bore 3.0m deep 250 mm dia Recharge bore alone 3.0 m deep Every additional 1.0 m depth of recharge bore Filter Chamber and 1.0 metre pipeling Recharge well of 90 cm dia with RCC rings for 3.0 m depth Supplying and laying 100 mm dia PVC pipe at 1.0
m depth
RCC cover slab in CC 1:2:4 5 cm thick 7.5 cm thick 10 cm thick |
Each Each metre Each Each Each
metre
Each Each Each |
375.00 675.00 330.00 97.50 195.00 3075.00
116.25
183.75 277.50 413.50 |